mirror of
https://github.com/MaSzyna-EU07/maszyna.git
synced 2026-11-10 23:25:15 +01:00
Corrections to the TNESt3 distributor, checked against the ESt3 data and acceptance requirements (orange book tables 3-5, 3-7 and 3-9) and discussed with youBy: - The main control device settles at (control reservoir - pipe - 0.21) times the ratio instead of using a 0.05 bar offset. The 0.21 bar is the spring preload; without it the first stage came 0.2 bar of pipe drop too early. BVM is derived from the same offset, so a full service drop still gives MaxBP. - When the valve brakes it gives at least the minimum stage of 0.28 bar (acceptance tests 12 and 22 require 0.25-0.30 bar); when the target drops to zero the cylinder vents completely. - The automatic releaser vents the 15 l control reservoir from 5.0 to 0.4 bar in about 23 s (test 27: 23 +/- 3 s) instead of 5.6 s. - 12" cylinder fill nozzle dTN is 1.62, not 1.65 (typo). - With the AL2 relay the impulse chamber is 1 l and the cylinder nozzles are scaled so that the fill and release times meet table 3-9; before, the AL2 timings had been set by eye. On a valve test bench running the acceptance procedures, the number of results out of tolerance drops from 77 to 40. The remaining ones need parts that are not modelled yet (accelerator venting, ZP/ZS filling, intermediate chamber).