18
0
mirror of https://github.com/MaSzyna-EU07/maszyna.git synced 2026-11-21 06:14:58 +01:00

fix: EN57 brakes hauled with the brake hose alone, Knorr EP brake without control power

eu07/maszyna#87: the EP2 (and EP1) valve charged its auxiliary reservoir only
from the main reservoir pipe. A dead EN57 hauled by a locomotive coupled with
the hook and the brake hose alone ("3") never charged it, its control
reservoir stopped at about 2.5 bar and the unit didn't brake. The valve now
refills the auxiliary reservoir from the brake pipe through the slide valve's
check valve, as every ESt does (TESt::FillBrakeRes, shared with TESt::GetPF,
which stays bit for bit the same). With the main reservoir pipe charged the
auxiliary reservoir stays above the brake pipe and nothing changes; the
reservoir now also takes air from the brake pipe while it is below it, e.g.
at start-up before the compressor has charged the main reservoir pipe.

eu07/maszyna#134: the EP brake of the Knorr St113 handle (EN57-001) worked
with the reverser in neutral, the battery off or the EP fuse switched off
(Ctrl+Z). It now needs the control powered, as the Oerlikon handle's does
(EPBrakeControlPowered: battery, reverser out of neutral, EP fuse), and an
EP brake switched on drops out (holding the cylinder pressure) when the
control loses power. The positions of the EP release and brake were already
moved by 810b7ad07; a test pins them.

No change to game data needed.
This commit is contained in:
jerrrrycho
2026-11-08 04:25:34 +01:00
parent 68fdf1efdf
commit 87f1d960a0
6 changed files with 200 additions and 11 deletions

View File

@@ -620,6 +620,15 @@ class TESt : public TBrake
/// <param name="BCP">Brake cylinder pressure.</param>
/// <returns>Dimensionless opening coefficient.</returns>
double BVs(double BCP) const; // napelniacz pomocniczego
/// <summary>
/// Refills the auxiliary reservoir (ZP) from the valve pre-chamber through the
/// check valve of the slide valve, opened as far as <see cref="BVs"/> says, while
/// the pre-chamber is above the reservoir. The flows wait for the caller's Act().
/// </summary>
/// <param name="BCP">Brake cylinder (or impulse-chamber) pressure for <see cref="BVs"/>.</param>
/// <param name="dt">Time step [s].</param>
/// <returns>Volume taken into the auxiliary reservoir, 0.96 of it drawn from the brake pipe.</returns>
double FillBrakeRes(double BCP, double dt); // napelnianie pomocniczego z rozdzielacza
/// <summary>Vents the valve, brake and control reservoirs to zero.</summary>
void ForceEmptiness() override; // wymuszenie bycia pustym